On Day 15 we started having dirt hauled in to fill the space up to the point where the concrete slab will be poured.  We had already had two loads of sand brought in.  Part of that went into the mortar for the blocks.  The remainder was put in the foundation with a front end loader.



Four loads were hauled in on this day bringing our total up to six.  The cost for this is per load.  I am continually amazed that people just keep bringing stuff to us without any money up front.  I know I have the money to pay them.  I suppose it is just part of the construction business for them.